Water
Open cutting a new water main in a rural area rarely creates a problem. However, when open cutting streets, high end neighborhoods, or high traffic downtown areas, the time and money spent on restoration traffic control quickly exceed the cost of the pipe. Open cut may not even be an option due to access or permitting issues. This is where SEC, Inc. can help.
A 40,0000 lb rig works in a tight area pulling back 700’ of 4” DIP
|
A 40,0000 lb rig works in a tight area pulling back 700’ of 4” DIP
|
A look at 6” DIP just before pull back.
|
A drill works in a tight area during installation of 12” DIP.
|
A drill operator tracks alignment on an 8” DIP bore.
|
Regardless if you are an Engineer in Design Phase, or Contractor in Construction Phase we have a knowledgeable staff on hand that can help solve your problems.
Visit our Contact Page to find the specialist best suited for your needs.


